• Exterior Photo Slide Show: Oyers are gone, but pearl remains
  • Exterior Photo Slide Show: As can be observed, the structure is in very good shape. The monsoon-like weather has everything growing like a weed, including the weeds!
  • Exterior Photo Slide Show: View of the front and side from the West near Highway 105 access.
  • Exterior Photo Slide Show: Same view but closer.
  • Exterior Photo Slide Show: East bay door at rear of building
  • Exterior Photo Slide Show: Side of building with gravel drive leading to loading dock
  • Exterior Photo Slide Show: Side entry door with security light.
  • Exterior Photo Slide Show: Loading dock in rear
  • Exterior Photo Slide Show: Front entrance on left; also shows side entry door
  • Exterior Photo Slide Show: Front parking area with Trans Canada Highway in front of building
  • Exterior Photo Slide Show: Gravel drive to rear with distant view of Bras d'Or Lake
  • Exterior Photo Slide Show: Entrance to property from TCH
  • Exterior Photo Slide Show: East side of building with electric meter and oil deliver piping
  • Exterior Photo Slide Show: Another view of the side looking in the direction of Whycocomagh
  • Exterior Photo Slide Show: Gated road behind building that provides deeded access to the Bras d'Or Lakes.  It is a very good gravel road.
  • Exterior Photo Slide Show: View to adjacent lot to the West.
  • Exterior Photo Slide Show: Image
  • Exterior Photo Slide Show: A telephoto view of the building from the hillside of the lot across the highway - roof is in excellent shape.
Thumbnail panels:
Now Loading